SBC picks preliminary design; land swap inches forward
- brandyflukeroakley
- Jul 6, 2024
- 1 min read
by Elaine Cushman Carroll
Milton Times
The status of the School Building Committee’s (SBC)’s work on constructing a new school at the Milton High School campus saw significant movement in two key areas recently.
The building: The SBC voted to select a preliminary design layout option for the building project that will serve both middle and preschool students.
Comments